|
Are You Facing These?
|
 |
 |
 |
I am opening a new business and I would like to take care of my wastewater |
|
|
 |
 |
I have wastewater from production but no treatment system |
|
|
 |
 |
I want to build a waste water treatment plant |
|
|
 |
 |
I have a WWTP but the water seems doesn’t meet the DOE requirement |
|
|
 |
 |
My WWTP is having problems on its equipment |
|
|
 |
 |
DOE have issued a summon to my factory because of my waste water |
|
|
 |
 |
I have a WWTP but my staff spends too much of time at the WWTP |
|
|
 |
 |
I want to hire a new engineer to take care of my WWTP but how can he get trained? |
|
|
 |
 |
I want to do servicing to my WWTP but it is so troublesome |
|
|
Through our decades of experience in Industrial Effluent Treatment System (IETS), a comprehensive solution towards handling your effluent issue is what Reso Engineering capable of. Our services includes, |
|
Consultation & existing system auditing |
|
Industrial Effluent Characteristic Study (IECS) |
|
Effluent treatability study |
|
Environmental Quality (Industrial Effluents) Regulations 2009 Written Notification |
|
Wastewater treatment plant operate and manage |
|
Wastewater treatment plant design |
|
Wastewater treatment plant fabrication and installation |
|
Wastewater treatment plant’s Parts and equipment supply |
|
WWTP competent person guiding and training |
|
WWTP equipment servicing |
|
Whole Industrial Effluent Treatment System (IETS) Set-up
|
 |
 |
Effluent (wastewater) generated by a factory/ plant needs to comply with the regulation set by the Department of Environment (DOE) |
 |
 |
The IETS aim to treat non-complying wastewater by removing or control components that exceed the guideline set by the DOE before releasing it to the public drain |
|
|
|
 |
|
 |
|
 |
Step 4 |
Solid Liquid Separation |
|
 |
Step 5 |
Biological/ Aeration |
|
 |
|
 |
|
|
.png) |
|
Consultation of Existing WWTP and Auditing
|
 |
Detailed survey on the IETS (search for source of problem) |
|
Identify type of waste |
|
Come out with findings from the survey |
|
Provide with direction to cater problem rose |
|
Conduct treatability study with complete report |
|
Built, Operate and Manage (Outsourcing Management)
|
 |
Reso undertakes on design, constructing, operate and manage of the wastewater treatment plant |
|
Identify type of waste |
|
We will be stationed at the WWTP to operate and manage it |
|
Factories shall focus on what they do best, production of products |
|
 |
A study done by our in-house lab professional to ensure wastewater treatment plant to be invested shall perform according to their needs |
|
 |
The right procedures and scale of procedures |
|
|
|
 |
Step 2 |
Type and amount of chemical dosage |
|
 |
|
 |
Step 4 |
Filtration and etc would be integrated |
|
|
 |
The full study is recorded and documented for the use of future reference by clients |
|
|
 |
 |
Raw Wastewater |
|
|
 |
 |
Partially Treated Wastewater |
|
|
 |
 |
Fully Treated Wastewater |
|
|
Industrial Effluent Characteristic Study (IECS) Required by DOE
|
 |
Working with our strategic partner, a 3 days wastewater generation study from a factory shall be conducted. A study to determine, |
|
Waste Water Chemistry |
Properties of waste water |
|
|
Waste Water Flow Rate |
Waste water generation from production facility |
|
|
Waste Water Flow Pattern |
Flow pattern of waste water generated
Example 2m3 at 10am, 4m3 at 4pm |
|
|
WWTP Competent Person Guiding and Training
|
 |
Reso is experienced in training staff from basic to advance knowledges in order to be a well-equipped competent person for WWTP. Training exposes the staff to, |
|
WWTP important theoretical knowledge |
|
Highly practical on-site skills to manage the WWTP |
|
DOE Wastewater compliances to be taken care of |
|
WWTP Equipment Servicing
|
 |
Filter media replacement |
|
Overall tank cleaning |
|
Equipment’s wear and tear parts replacement |
|
Gearing oil replacement |